1998 and currently Ingelectra Constructora S.A.
Supervisor in the construction of electromechanical
works in projects such as: Central American ALCOA
CSI, Operations Center of the National Bank (BOLTEC)
– Price Smart Zapote, Escazú, and Heredia
– Refrigerators Warehouse of the CCSS (Costa
Rican Social Security) – UTI of the Mexico Hospital
– CONAIR, Turrialba – Global Park: West
Star Medical, Exactus Building, PPC Industries –
Outback Steakhouse Restaurant – Residual Water
Treatment Plants: Dos Pinos, Philip Morris, Gerber
and Sardimar – Hampton Inn Hotel and Suites
– Costa Rican Laminator, Mas X Menos Supermarkets,
Sabana.
1998 Climate Control S.A. Panama
City, Panama
Sale, installation and maintenance of Air Condition
Systems
MICROTRONICS, S.A.
Sale, installation of electronic security systems:
theft and assault, fire, access control, (C.C.T.V.)
1994 – 1995 VESTA Electricity
and Telephony, S.A. (ALTESA)
In charge of projects on High and Low Voltage
1994 – 1995 INCESA STANDARD, S.A.
Supervisor of the Oven Department.