Currently: Ingelectra Constructora
Electromecánica S.A.
Project Supervisor Assistant
January 2006 – Caja Costarricense
de Seguro Social (Costa Rican Health Services)
November 2006 Responsibilities: Project Inspection
and Design in the main clinics and hospitals of the
country, some of the most relevant ones were:
•
Electrical Redesign of the Clorito Picado Clinic
in Cinco Esquinas de Tibás, this design has
a 500KVA capacity, it still has not been executed.
• Deep Wells
Inspection of Work done in: Honne Creeck, Talamanca,
with a capacity of 5gls/min and a 40 meter depth;
and in the Marcial Fallas Clinic, Desamparados with
a capacity of 8gls/min and an 80 meter depth.
• Design of
a New Central Kitchen at the Monseñor Sanabria
Hospital in Puntarenas, in the mechanical area, which
includes the Vapor System, LPG Gas Network, Air Injection
and Extraction System, Drinking and Residual Waters.
• Redesign
of the Electromechanical Area of the Filling Section
of the Parenteral Solutions Laboratory of the CCSS
(Costa Rican Health Services) located in Barreal de
Heredia, the project included the redesign of the
vapor pipes, redesign of the compressed air, distilled
water, vapor and hot air extraction pipes, redesign
of the air-conditioning of the Filling Room and all
the electrical part of this area.
• Design and
Inspection of the Remodeling of the Electrical System
of the EBAIS in Platanar de San Carlos, with a capacity
of 75 KVA.
• Inspection
of the Expansion of the Connection Pipes at the San
Rafael Clinic in Puntarenas and at the Tilarán
Clínic, each one with a capacity of 225 KVA.
• Electrical
Redesign of the Jicaral Clinic in Puntarenas with
a capacity of 225 KVA.
• Electrical
Redesign of the Chacarita Clinic in Puntarenas with
a capacity of 225 KVA
April 2004 Glacial, S.A.
December 2006
Responsibilities: I worked for this company as a salesperson
of air-conditioning parts, and at the same time I
coordinated the technical services offered to the
clients.